What is HVAC Testing, Adjusting & Balancing (TAB)?
Testing, Adjusting, and Balancing (TAB) is a critical process that ensures HVAC systems are operating at their designed efficiency, airflow distribution, and thermal comfort levels.
At Ziltose, our certified TAB professionals use advanced diagnostic tools to fine-tune your HVAC system, ensuring optimal air circulation, reduced energy consumption, and enhanced occupant comfort.

-
Root Cause Identification: Thoroughly analyzes HVAC systems to pinpoint underlying issues.
-
Comprehensive Testing: Conducts detailed assessments of various HVAC components, including:
-
Chillers (various types)
-
Fresh Air Handling Units (FAHU)
-
Air Handling Units (AHU)
-
Ecology Units
-
Fan Coil Units (FCU)
-
Pumps
-
Other HVAC systems
-
Precise Adjustments: Fine-tunes system components for balanced airflow and accurate temperature control.
-
Performance Optimization: Ensures HVAC systems operate efficiently, reducing energy consumption and enhancing comfort.
-
Issue Resolution: Implements targeted solutions to resolve identified issues, ensuring long-term system reliability.
-
Advanced Equipment: Utilizes calibrated test equipment from the UK, US, and Germany for precise and reliable testing.


Why Choose Ziltose for HVAC TAB Services?
✅ Certified TAB Professionals – NEBB & AABC-certified HVAC experts
✅ State-of-the-Art Diagnostic Tools – Airflow meters, anemometers & pressure gauges
✅ Detailed TAB Reports – Full analysis of airflow, pressure, and system efficiency
✅ Compliance with ASHRAE & SMACNA Standards – Ensures regulatory adherence
-
What is data center commissioning, and why is it important?Data center commissioning is a structured process that ensures all critical systems (power, cooling, IT infrastructure) function as designed before going live. It minimizes the risk of failures, enhances uptime, and ensures compliance with Uptime Institute, ASHRAE, and ISO standards.
-
What are the different levels of commissioning (L1 to L5) in a data center?Commissioning is divided into five levels: Level 1 – Factory Acceptance Testing (FAT): Equipment testing before shipment. Level 2 – Site Acceptance Testing (SAT): Verifying installation at the site. Level 3 – Pre-Functional Testing (PFT): Initial testing of individual systems. Level 4 – Functional Performance Testing (FPT): Integrated system performance testing. Level 5 – Integrated System Testing (IST): Full-scale operational testing under real-world conditions.
-
What is the role of a commissioning agent in data center projects?A commissioning agent (CxA) ensures that the facility meets its design intent by overseeing installation, testing, and performance validation. They act as an independent third party to verify compliance with standards and project specifications.
-
What are the Uptime Institute commissioning requirements for Tier III & Tier IV data centers?The Uptime Institute mandates rigorous testing protocols, including redundancy validation, integrated system testing, and failure scenario simulations to ensure reliability for Tier III (N+1) and Tier IV (2N+1) data centers.